Public Works Department 2008 - Road Projects:

The following is the proposed schedule for the various roads that will be milled and repaved. Most of the roads listed below will have curb and sidewalk replacements done. The hours of operation will be approximately 7:00 a.m. to 5:00 p.m. and may change as necessary. Curb and sidewalk projects are scheduled to begin in March/April. Road paving projects are scheduled to begin in July/August.

****(Please be sure to read the important mailbox information outlined below.)****

The following roads are scheduled to be paved:

* Curb and sidewalk replacements scheduled. Note: Not all properties will be done, only where we feel it is necessary.

During the project, your street will be closed except for local traffic and emergency vehicles. During the milling and paving of your street we are requiring that all cars be parked in their driveways. This will assist us in completing this project in a timely manner. Due to extreme temperatures of the material, it is recommended that you keep children and pets away from the street area where the paving process is taking place. Please avoid driving your vehicle on this material during the placement of blacktop or crack sealer material to avoid damage to your vehicle. We will not be held liable for any resulting damages.

In the event that curb and sidewalk replacements will be done on your road, all driveway and lawn restorations will be done in a timely manner upon completion of the paving project. Some residents will have to park their vehicles in the street during driveway curb restoration. ****Each property owner should check their mailbox front to ensure that it is a minimum of 7 inches behind the face of the curb, which is within federal postal regulations. Prior to the start of the paving project, the homeowner should reset any mailboxes protruding past the minimum measurement of 7 inches behind the face of the curb. This will ensure that the mailbox will not be damaged during the milling and paving operation. Any damage that may occur will be the responsibility of the homeowner.****

Defacing or writing in concrete will be treated as criminal mischief vandalism and will be handled by the Montgomery Township Police Department. Anyone that witness's vandalism is asked to please call the Police Department at (215) 362-2300.

Please trim any trees or shrubs extending past the edge of the roadway or curb. This will allow our paving equipment to pass safely in front of your property. Montgomery Township will not be responsible for anything damaged in the right-of-way, such as invisible dog fencing, basketball backstops etc.

The Township requests your patience and cooperation during this operation. If you have any questions, please feel free to contact the Public Works Department at (215) 855-0510. Thank you for your time and cooperation in this matter.

More pages in this section:

Public Works

More pages in this section:

Township Departments


Page Tools


Montgomery Township Municipal Building

Montgomery Township
1001 Stump Road
Montgomeryville, PA18936-9605

View Complete Contact List

2001-2008, Montgomery Township. All rights reserved

Awards And Accolades View our Awards & Accolades